(715) 233-8665 Free Estimate
Aerial view of a long post-frame livestock barn with a white ribbed steel roof on a snowy farm, red and blue machine sheds behind it

Pole Barn Roofing in Chippewa County, WI

Steel roofs on the post-frame buildings that run a farm or an acreage: pole barns, machine sheds, livestock barns and shops. Re-screws, re-sheets and new roofs, with the purlins checked from inside before anything is priced.

Get a Pole Barn Roof Estimate

Tell us what's going on with your roof and we'll call you back.

Prefer to talk? Call (715) 233-8665

By sending this form you agree to be contacted about your roof. See our privacy policy.

  • Free estimates on pole barn roofs
  • Re-screw, re-sheet or new steel
  • Farms and acreages across Chippewa County
Post-frame building under construction with blue-gray steel roof panels screwed over rows of wood purlins on the trusses, the lean-to framing still open
How a post-frame roof works

Pole Barn Roofing in Chippewa County: Ribbed Steel Screwed to Wood Purlins

Almost every pole barn, machine shed and farm shop between Bloomer, Cadott and the Town of Anson is roofed the same way. Ribbed steel panels, about three feet wide, run from eave to ridge and are screwed through the face into 2x4 or 2x6 purlins laid flat across the trusses. There is no plywood deck. The panel is the roof.

That makes the steel more than a weather skin. Writing in the National Frame Building Association's magazine, Dave Bohnhoff, an emeritus engineering professor at the University of Wisconsin-Madison, notes that metal panels through-fastened to purlins provide "significant diaphragm action": the roof helps carry wind load from the end walls to the side walls. Every screw is doing two jobs, holding water out and holding the building square.

Three things follow from that, and they shape everything else on this page:

  • The purlins decide the job. New steel is only as good as the wood it screws into, and the wood is hidden until the old sheet is off.
  • Screws are structural. Wick Buildings, a post-frame builder, reports that its 1½-inch roof screws give 56.5 percent more uplift resistance than 1-inch screws. Short screws into tired purlins are how panels leave in a storm.
  • The roof comes off in sections. On a re-sheet we strip and cover one run of panels at a time rather than leaving a whole slope open to the wind.
Same steel, different building

Machine Shed, Livestock Barn or Heated Shop: How Each Changes the Roof

What goes on under the roof matters as much as the roof. Pick the building closest to yours.

Open-sided pole barns, hay sheds and cold storage

The simplest roof on the farm and usually the oldest. Open sides or big doors keep air moving, so condensation is rarely the complaint. Rust is. Hay and bedding hold moisture against the purlins, birds nest in open rib ends, and many of these roofs went on with nails that have since worked loose.

What we usually specify:

  • Bare or painted 29 gauge is usually enough.
  • Foam closures at the eave and ridge to keep birds and blown snow out of the ribs.
  • Screws, not nails, on every re-roof, set into fresh wood beside the old holes.

Closed machine sheds and implement storage

Closed walls, a big door and often a gravel or dirt floor. Equipment comes in wet and covered in snow, the ground breathes moisture all winter, and nobody runs a fan. This is the building where bare steel sweats on a cold night and drips on the planter in the morning.

What we usually specify:

  • Panels ordered with a factory drip-stop backing when the roof is re-sheeted.
  • Ridge vent with matching openings at the eaves.
  • Wide door headers checked for sag before new steel is fastened above them.

Livestock and horse barns

Animals put heat and water vapor into the air every hour of the day, and the roof has to shed that moisture or it rains inside. Work is staged around the animals, a section at a time, with the building closed up again each night.

What we usually specify:

  • Ventilation first: eave and ridge openings sized together.
  • A condensation backing rated for animal confinement, where the panel maker offers one.
  • Purlins over pens checked closely; that is where rot starts.

Heated shops and insulated post-frame buildings

Once a building is heated, it behaves more like a house. Warm, moist air rises to the roof and finds the coldest surface. A drip-stop backing alone is not enough here; the roof needs insulation with a continuous vapor retarder on the warm side, and the ventilation has to suit it.

What we usually specify:

  • Insulation and vapor retarder planned before the steel goes on.
  • Heaters vented to the outside, never an unvented space heater.
  • Ice at the eaves treated as a heat-loss problem, not a roofing one.
Before any steel is ordered

Purlins, Trusses and Old Screw Holes: What We Check on a Pole Barn Before Bidding

We look from inside the building before we look from the roof. This is the list we work through, and what each item does to the estimate.

Inside the building, with a light

  • Purlin rot and stains. Dark streaks along a purlin line follow old leaks. Soft wood gets replaced or sistered, not screwed into again.
  • Splits at the fastener rows. A purlin split along its old screw line will not hold a new one.
  • Purlin spacing. It sets the panel gauge and the screw pattern, and wider-than-usual spacing on an older barn changes the order.
  • Truss chords, webs and plates. Cracked chords, missing bracing or rusted plates go to the building supplier or an engineer. We do not guess at structure.
  • Bearing at the posts. Rot at the truss-to-post connection shows up as a dip in the roof line from outside.
  • What is stored or kept below. Livestock, hay, grain or a heated shop each change the condensation plan and how the work is staged.

On the roof and around the eaves

  • Rust at the laps and eaves. Red rust through the paint at the bottom few feet, where snow sits longest, usually means new steel rather than screws.
  • Screw rows. Backed-out heads, cracked washers and more than one hole beside each screw tell us how many times it has already been re-screwed.
  • The roof line. A sag between trusses or a wave at the ridge tells us where to look harder inside.
  • Ridge cap, rake trim and closures. Loose trim at the gable ends is where wind starts peeling a roof.
  • Lean-to tie-ins. The valley or wall flashing where a lean-to meets the main roof is a frequent leak on an older barn.
  • Skylight panels. Old fiberglass panels are brittle; they get priced separately.

An honest note on surprises: the top face of a purlin cannot be seen until the old sheet is off. Ask any bidder how purlin replacement will be priced if bad wood turns up, so that cost is agreed before the first panel comes down, not argued about afterward.

The decision

Re-Screw, Re-Sheet or a New Pole Barn Roof: Which Fix the Steel Needs

Three levels of work, from cheapest to most complete. We will recommend the lowest one that actually solves the problem.

  1. 1

    Re-screw the panels

    When: the steel and its paint are sound, and the drips line up with screw rows.

    What it is: every fastener replaced with a larger-diameter screw and a new washer.

    Skip it if: the panels have already been re-screwed once and the holes are oval. Screw-level fixes are covered in detail on our metal roof repair page.

  2. 2

    Re-sheet part of the roof

    When: one slope, a lean-to or the bottom courses have rusted through while the rest is sound.

    What it is: new panels on that section, with purlins fixed while they are exposed.

    Skip it if: the old profile is no longer made. A mismatched rib leaks at every side lap.

  3. 3

    Strip and re-roof the whole barn

    When: rust is general, the holes no longer hold, or enough purlins need work that the sheets must come off anyway.

    What it is: old steel off, purlins repaired, new panels, trim, closures and, where it fits, a drip-stop backing.

    Skip it if: the frame itself is failing. A new roof on a frame that is leaving is money thrown after the building.

New steel over the old panels?

It can be done on furring strips, and some barns get it. We seldom recommend it. It hides the purlins, the one thing most worth looking at, adds a second layer of steel to a frame designed for one, and traps moisture between the sheets. Stripping a barn roof is fast work compared with a house, and it buys you a look at the wood.

When we talk you out of re-sheeting the barn

If a re-screw will carry a sound roof another stretch of years, we will say so, even though a new roof is the bigger ticket. If the building is beyond a sensible roof, we will say that too. And if your farm is outside our area, we will point you to someone closer.

Ordering the steel

29 vs. 26 Gauge Steel and Rib Profiles for Pole Barn Roofs

A lower gauge number means thicker steel. The difference is smaller than the price gap suggests.

Hansen Pole Buildings, a post-frame kit supplier, calls 29 gauge "the standard in the post frame industry" and puts the gap to 26 gauge at .0045 of an inch, about the thickness of a sheet of paper. Its own load-table example, an ABC Imperial Rib panel across three 24-inch spans, holds 124 pounds per square foot in 29 gauge and 141 in 26, a difference of under 14 percent.

So when is 26 gauge worth it here?

  • Purlins set wider apart than the panel's load table allows in 29 gauge.
  • A roof you or a hired hand will walk on to clear snow or service a vent.
  • Hail. Thicker steel dents less, and storm reports logged hail up to 3 inches across northeast of Bloomer in July 2023.

Hansen also notes that roll formers order 26 gauge by a minimum thickness, and that none of the ones it asked would guarantee the full .0187. Ask for the minimum on the quote.

Ag-style rib panels

Lower, closely spaced ribs. The common, economical farm panel; fine on most pole barns and sheds at typical purlin spacing.

R-panel and PBR-style profiles

Taller, wider-spaced major ribs with a purlin-bearing leg at the side lap. Stiffer between purlins; ABC Metal Roofing, for one, offers its Drip Stop backing on its PBR panel.

Bare Galvalume or painted steel

Bare zinc-aluminum coated steel costs least. Painted panels cost more and hold their color; paint systems and their fade and chalk terms vary by maker.

Standing seam, with hidden fasteners, belongs on houses more than barns. If you are weighing it for a farmhouse, see our standing seam metal roofing page. The published per-square ranges for screw-down steel are in our roof replacement cost guide; for your building we price the panels, trim and purlin work in writing.

When it rains inside

Pole Barn Condensation: Drip-Stop Backing, Ridge Vents and Moisture Sources

A barn that drips on a dry, clear morning is not leaking. Warm, wet air rose overnight, met steel chilled by the night sky, and turned to water or frost on the underside.

Where the water in a farm building comes from

  • Livestock and horses
  • A dirt, fill or gravel floor
  • Poor drainage around the building
  • Unvented propane or kerosene heaters
  • Snow melting off equipment
  • Washing down floors or machines
  • Firewood and green lumber
  • Fresh hay and stored grain
  • A new concrete floor still curing

The list follows the moisture sources Wick Buildings names for post-frame buildings. Cut the sources and the roof has less to deal with.

Let it out

Eave and ridge venting

Warm air rises; a ridge vent lets it leave and eave openings let dry air in. Wick advises that the open area at the eaves should equal the open area at the ridge, and says the eaves are where venting is most often underestimated.

Catch it

Drip-stop backing on new panels

A felt-like polyester layer bonded to the underside of the panel holds the moisture and lets it go back to the air as the day warms. ABC Metal Roofing applies its Drip Stop in the factory and has installers heat-fuse the fibers at end laps and trim, so the felt cannot wick water in from outside.

Keep it off the steel

Insulation and a vapor retarder

For heated buildings. It works only when the vapor retarder is continuous on the warm side. A vapor retarder under a new floor, gravel or concrete, keeps ground moisture out in the first place.

The catch with a backing: it comes on the panel or not at all. Wick states its membrane cannot be added to an existing structure. On a sound roof that sweats, we will talk ventilation and moisture sources rather than sell you new steel. Drips that come from screws and laps, not condensation, are a repair job.

Long buildings

End Laps and Thermal Movement on Long Pole Barn Roof Runs

Steel grows on a July afternoon and shrinks on a January night, and a long roof run feels it most.

Engineer Kenneth Guffey, writing in the National Frame Building Association's magazine, says it is not uncommon for a steel roof panel to change length by at least half an inch in 40 feet between its coldest and warmest. On a wide machine shed, the run from eave to ridge can be longer than that.

Where a run is too long for one sheet, two panels overlap at an end lap. That joint takes the movement, and on big buildings it is where trouble collects. The signs Guffey lists from field investigations:

Leaking end laps
Water drawn uphill under the upper panel, worst under drifting snow.
Screws backing out at the lap
The panel's movement walks the fastener out of the wood.
Oval screw holes
The upper panel elongates its holes first; the washer no longer covers them.
Screws sheared under the washer
The panel has been pushing against a fastener that cannot move with it.
Torn washers
The panel slides under the washer until the rubber splits.
Rotting wood under the lap
The purlin below a leaking lap stays wet season after season.

His observations point to the fix: roofs with a single panel per run and no end laps had few issues, provided a steel panel was under 36 feet, and runs with more than one end lap had more trouble than runs with one. We order one length from eave to ridge whenever it can be shipped and handled, and on longer runs we follow the panel maker's end lap detail exactly: sealant, lap length and screw locations.

Aerial view of a post-frame barn addition being roofed in early winter snow, purlins across the trusses on one wing and light gray steel on the other, with a valley where the two roofs meet
Weather

Snow Load, Lean-To Drifts and Wind Uplift on Pole Barns

Chippewa County sits in the 40 pounds per square foot zone on the roof snow load map in Wisconsin's Uniform Dwelling Code. That map is for houses. A farm building is engineered by its supplier to its own design loads, and an older shed may have been built to less than a house would be.

FEMA's Snow Load Safety Guide puts a foot of fresh snow anywhere from 3 pounds per square foot for light, dry snow to 21 for wet, heavy snow, and warns that drifts build up on a lower roof. On a farm, that lower roof is the lean-to.

  • Lean-tos and valleys. Snow slides off the main roof and packs onto the lean-to below. We check its purlins and the tie-in flashing hardest.
  • Doors and walkways. Steel lets go of snow all at once. Over an overhead door, a walk door or parked equipment, a slide is a hazard.
  • No added weight. We do not put new steel over old steel on a frame we cannot confirm, which is one more reason we strip rather than layer.
  • Frame questions go to an engineer. If we think the trusses are undersized for the snow they carry, we say so and refer it out.

Wind is the summer half. Buildings in open fields along Highway 64 near Bloomer and Highway 27 near Cadott take it full on, and the National Weather Service documented straight-line wind damage across Chippewa County on May 15, 2025. Wind lifts steel at a loose rake trim or a ridge cap missing its closures, then peels the panel back from there.

Paperwork

Pole Barn Re-Roof Permits: Farm Exemptions, County Zoning and Shoreland Rules

Three different rule books can touch a farm building here, and they answer different questions.

The state building code and farm buildings

Wisconsin's commercial building code, SPS 361 to 366, does not apply to "buildings and structures that are on a farm premises and used exclusively for farming purposes." A shop where you repair other people's equipment, a farm store or a rented storage building can fall outside that exemption, so how the building is used matters more than how it looks.

Chippewa County zoning

The county says the Towns of Anson, Eagle Point, Hallie, Lafayette, Wheaton and Woodmohr have adopted its comprehensive zoning ordinance. In any other town, the town clerk is the first call. The county's fee schedule is written around new structures, additions and alterations. We have not found a county rule that addresses re-roofing an existing building on its own, so we ask about your parcel rather than assume.

Near the Chippewa River, a lake or a stream

Chippewa County's shoreland zoning applies within 300 feet of a river or stream and 1,000 feet of a lake, pond or flowage, and requires permits for new construction, additions and alterations. A like-for-like roof is a simpler matter than changing the building, but if the barn sits near the water, raise it early.

Pole buildings inside Chippewa Falls city limits

A pole building on a lot in the City of Chippewa Falls follows the city's rule, which exempts roofing replacement under $2,000. A full re-sheet will almost always come in above that line.

Before a job is scheduled, we call the office that has your property and tell you what they said. Phone and text hours: Open 8am–6pm.

For houses, garages and the choice between the two kinds of steel, start with our page on metal roofing in Chippewa Falls. Shingle, flat and storm work are on the home page of our roofing company in Chippewa Falls.

FAQ

Pole Barn Roofing FAQ: Skylight Panels, Insulation, Old Dairy Barns and New Frames

Do I need a permit to re-roof a pole barn in Chippewa County?

It depends on where the building sits and how it is used. Wisconsin's commercial building code does not apply to buildings on a farm used exclusively for farming. Zoning is separate: six towns use the Chippewa County zoning ordinance, zoning in the other towns is a question for the town, and inside the City of Chippewa Falls the city's permit rule applies. None of the county pages we checked publishes a rule for re-roofing on its own, so we call the right office for your parcel before the job is scheduled and tell you what they said.

Can drip-stop backing be added to the steel already on my barn?

Not the factory kind. Drip-stop and similar felt-like membranes are bonded to the panels when they are made, and at least one building maker states plainly that its membrane cannot be added to an existing structure. On a sound roof, the fixes for condensation are ventilation and dealing with where the moisture comes from. If the roof is due for new steel anyway, that is the time to order panels with the backing.

Should the old fiberglass skylight panels be replaced when the barn is re-sheeted?

Almost always. Translucent panels yellow, turn brittle in the sun and crack under hail or a slip of a boot, and they rarely match a new steel profile exactly. We price new translucent panels in the same rib profile as the steel, or close the openings with steel if you would rather lose the light than the leaks.

Is it worth insulating a machine shed roof while the steel is off?

Only if you plan to heat the building or the condensation is bad enough that a backing will not handle it. In an unheated shed, insulation adds cost and can trap moisture if the vapor retarder is not continuous. Wick Buildings, a post-frame builder, puts it bluntly: insulation is no guarantee against condensation. Ventilation and keeping water out of the building do more for less.

How long can one steel panel run before the roof needs an end lap?

There is no single number, because panel makers and roll formers set their own limits for shipping and handling. What field experience reported in the National Frame Building Association's magazine shows is that roofs with a single panel and no end laps had few issues as long as a steel panel was under 36 feet, and that runs with more than one end lap had more trouble than runs with one. We order one piece from eave to ridge whenever the building allows it.

Do you put steel on new post-frame buildings?

We roof them once the posts, trusses and purlins are up, and we re-roof existing ones. We do not design or erect the frame. If you are building new, the frame supplier or engineer sets the snow and wind loads, and we follow the panel and fastener schedule that goes with them.

What about an old gambrel or hip-roof dairy barn?

We look at each one. A barn whose frame is still straight can take new steel over repaired or added nailers. If the walls have spread, the plates have rotted or the roof has been open for years, the framing has to be dealt with first by someone who repairs barn frames, and we will tell you plainly if we think the money is better spent on a new building.

Have the Purlins Checked Before the Pole Barn Roof Is Priced

We walk the building inside and out, look at the purlins, trusses and screws, and write up whether it needs screws, new sheets or a new roof.

Call Text Free Estimate